The Fair Trading Commission’s (FTC) decision to grant temporary rate increases to the Barbados Light & Power Company Limited has drawn strong criticism from consumer advocates.
In a ruling dated last Friday, the FTC approved an application from the utility to recover the rental and operating costs of 11 megawatts of temporary Aggreko generator units through the fuel clause adjustment (FCA) – meaning the costs will be passed on to consumers.
The decision, which is backdated to September 16, 2022, allows a cap of 50 per cent of the requested rates for all customers, except for Light & Power employees, who will be charged the full rate as requested.
Intervenor Ricky Went argued that his team had recommended the company buy the generators rather than rent them and recover the cost through the rate base.
“There should not have been any increase in rates, temporary or otherwise,” Went told Barbados TODAY on Tuesday.
He noted that the utility had cited the scheduled 2026 retirement of one generator, known as GT03, as a justification for renting the 11 MW Aggreko units.
“However, the record shows that the company’s capital programme had already accounted for the retirement of GT03 when it acquired the Clean Energy Bridge (CEB). If a capacity shortfall was anticipated, the company would (or should) not have incurred costs to return the 12 MW Aggreko units in May 2022,” Went argued.
“Taking all the foregoing into account, our team still supports the addition of generating capacity, if only out of an abundance of caution to avoid a repeat of the embarrassing island-wide blackout in 2019,” he added.
Went pledged that his team would share further insights after reviewing the decision in detail.
Consumer advocate Maureen Holder described the FTC’s decision as a mixed bag for consumers.
“The FTC’s recent decision brings some elements of consumer protection, but it offers limited relief for Barbadians grappling with rising costs,” said Holder, executive director of the Barbados Consumer Empowerment Network (BCEN), in an interview with Barbados TODAY.
She noted several points she wanted Barbadians to be aware of regarding the commission’s ruling.
“BCEN emphasises that while the FTC’s decision enables BL&PC to stabilise service and distribute costs, it also raises concerns about the use of the FCA. Traditionally, the FCA is intended to manage uncontrollable fluctuations in fuel prices rather than covering short-term infrastructure costs associated with specific events,” she explained.
“The decision exposes the reliance on diesel generators, which are known for their high costs and inefficiency, and highlights the problem of passing the expenses for the generators onto consumers. Notably, the rental of the generators was originally meant to accommodate an anticipated temporary surge in demand for an activity such as the Cricket World Cup. This was a major reason stipulated for the BLPC application.”
Holder also questioned the timing of the utility regulator’s ruling, given that it came four months after the Cricket World Cup, raising doubts about whether consumers should shoulder the ongoing rental costs for generators that may no longer be necessary.
“Ideally,” the consumer advocate argued, “decisions regarding consumer costs should occur before or immediately after significant expenses arise, allowing for transparency and understanding. Delayed rulings could contribute to consumer frustrations and a perception that they are being asked to cover unforeseen or poorly planned expenditures.”
The Barbados Renewable Energy Association (BREA) is expected to issue an official response on Friday.
In a notice on its website, the electric company acknowledged the FTC’s decision and advised customers that the interim rate increase would take effect from September 16, 2022.
“We wish to advise that customers receiving bills from September 16, 2022, will see the new rates reflected in their bills. These rates will remain in place until the commission issues a final determination on Light & Power’s substantive application for a rate review,” the company announced.
Light & Power also committed to refunding customers with interest if the final rates set after a substantive hearing are lower than the interim rates. The company maintains that its rates “will still be among the lowest in the Caribbean” even after the increase, citing as a factor in containing costs its new Clean Energy Bridge plant–a 33-megawatt medium-speed diesel generation facility in St Lucy.
It said: “Light & Power affirms its commitment to customers that if, following the substantive rate hearing, the commission sets rates lower than the interim rates, it will refund customers the difference between the interim rate and the final rate, with interest.”
The FTC ruled that the rental of the Aggreko units, with a capacity of 11 MW, is approved for at least 12 consecutive months from the actual commercial operation date of the units.
It stated that a further 12-month approval might be granted if the commission is satisfied that market conditions warrant the need for additional capacity at that time.
“In such circumstances, the BL&PC will be required to formally inform the commission of the need for the extension of approval, and any revised contractual details, no later than four months before the expiration of the approved 12 months,” the regulator stipulated.
The commission mandated the annual submission of maintenance reports for all generating units no later than one month after the end of the calendar year. The FTC said it will immediately investigate the unexpected downtime of generating unit GT04 and reserves the right to conduct audits at any time regarding the operation and management of all components of the power system.